Project Evaluation and Development
Risk Analysis
This is a massive development that can be adversely influenced on all levels of construction over a certain period.
Planning/ briefing stage
Acquiring a permit involves a lot of process from issuing an application, and changes to the precise area proposed may call for additional time and hence finance so as to meet the planning needs and appropriate development policies.
Construction stage: several development projects call for time to be finished. A number of financial risks may arise like probable market variation, inflation, delay in payment, and unexpected surplus taxes among others after an application is approved though construction is in progress.
The solution for each and every case brought about by the risk that comprise: technical, that involves site assessment, source and availability of resources, among others, geographical like weather trends and impact brought about by seasons, employment, like the availability of resources, varied forms of construction, safety and security of staff and facilities, as well as health and safety in addition to environmental policies (Construction enquirer). All of these have an impact on economic project result and normally require additional finance for them to be well managed.
Physical constraints: flood risk evaluation, noise pollution, soil contamination have to considered when evaluating the level of risk at the start of the development.
Risk management: identify – Assess – Control – Recover
Physical constraints: in depth survey of the sites, soil analysis and materials that are meant for use in the construction have to be well tested, appropriate legislations have to be applied.
Financial risks: regular research on the market variations, regional or local updates.
Communication in all departments and phases (for everyone that takes part in the project): starting from the local companies, planner, contractors and customers among others (Construction Index).
Planning history review
| Applications permitted | |
| 31 – 08 – 2011 | Essential destruction of Law Building. |
| 31 – 08 – 2011 | Anne Knight Building: Bringing down of the west wing & in its place a glazed elevation. Placement of mezzanine. Restoration of blind windows. Repairs to fabric of the building. |
| 09 – 12 – 2010 | Magnolia – root pruning. |
| 19 – 06 – 2008 | Magnolia – crown elevation to 2.4m over footway. |
| 31 – 07 – 2003 | Falling of trees. |
| 28 – 08 – 1998 | Destruction of offices (Duke House) and in place a new office structure with basement car park. |
| 07 – 12 – 1990 | Destruction offices (Duke House) and putting up new offices with basement car park. |
| Approved full application | |
| 12 – 03 – 1997 | Extrapolation and renovation of available church covering new internal floor to sanctuary, new extensions to the sides & a rear hall. |
| 21 – 03 – 1995 | Bringing down of all structures and in place a 4 storey B1 office unit car parking with a self-contained vehicular access, landscaping, among others. |
| 21 – 09 – 1994 | Duke House & Lex Garages Victoria Road South Amendment to roofscape of approved 4 storey office/financial and professional services building and increase in its roof pitch. |
| 30 – 03 – 1994 | Renovation and modification of the TA building and building of 3 no. 3/4 storey commercial B1 office units, a car parking with a self-contained pedestrian or vehicle access. |
| 01 – 02 – 1993 | Duke House & Lex Garages Victoria Road South Chelmsford Essex CM1 1LN bringing down of the garage showroom premises and Duke House and replacing it with new offices with underground car parking. |
| Subject to a S106 Agreement | |
| 31 – 08 – 2011 | Part full (Phase 1), Part outline (Phase 2) for an integrated use renovation for residents (C3), food storage (A1), business premises (B1), retail business (A1), financial & professional services (A2), restaurants/cafes (A3), drinking establishments (A4), hot food takeaways (A5) & non-residential institutions (D1). Transformation of Anne Knight Building to a dynamic A1-A3 use &/or D1 & /or D2. Changing of the Frederick Chancellor structure to B1 &/or D1 use. Parking, servicing, cars & pedestrian access, new & remade public spaces. Extensive destruction of Law Building. Bringing down of TPO trees and trees found in a Conservation Area. |
Review of local/national planning policies relevant to the site/development
- Chelmsford Town Centre Area Action Plan (CTCAAP):
Opportunity sites in the West End character area
East of England Strategy
| Policy E5: Regional buildings of Central Business District | |
|
Extensive emerging retail growth and opposite town centre ought to be basically be situated in the centres and be in line with the scale, size and character of the centre and the function it performs in the region.
Information on development plan ought to be bent on higher order allocation that offers the desire and the advancement would:
· Bring about a sustainable trend of growth and shift, comprising of a decline in desire to travel; · Has no major negative effects other centres or the transport network.
|
|
| Policy CH1 | Chelmsford Key Centre for the Development and Change |
|
The plan for the centre should: • Offer extensive growth of housing in an area of about 16,000 for the District; • extensive rise and differentiation of its employment base, creation of strengths in certain parts like business and financial services, manufacturing, research and growth, and retailing and town centre uses; • Exploit the re-use of previously developed land and provide for sustainable urban extensions;
|
|
| Housing | |
| Policy T14 | Parking |
|
Parking controls, should be applied for packages for managing transport need and impacting travel change, as well as improving public transport accessibility, walking and cycling, and consideration for coordinated trend in centres competing. Management of parking through parking standards ought to be used in new commercial development. These standards in PPG13 hav to be treated as maximums, though local authorities may use more severe standards to strengthen the impact of other measures like in regional transport nodes.
|
|
| Policy ENV6 | The Historic Environment |
|
The local planning bodies ought to note and protect, conserve and the historic environment of the region: · network of historic market towns; · protect areas and listed structures, comprising local, manufacturing and religious structures, · Major modelled landscapes.
|
|
| Policy ENV7 | Quality Environment Structures |
|
Local Development Data require new growth of high quality connecting the unique character and qualities of the region and advance urban resurgence New development must: • Offer structures an valid scale, located in the clear site analysis and urban design aspects; • make proficient use of land; • in housing improvement, acquire the best net density relevant to the character and public transport use; • Offer an integration of uses and structures forms where necessary; • advance effective use of resources and sustainable construction, and extensive recycling of products; • limiting pollution; • making use of opportunities for the structures to add to the physical, economic and community growth. Conservation-based growth ought to respect the traditional buildings and their value in quality, design and materials. In their strategies, laws, processes and proposals planning bodies ought to offer consideration to the chances through the region’s industrial, maritime and rural heritage.
|
|
| Policy ENG2 | Renewable Energy Targets |
|
The growth of new resources for renewable power generation has to be backed, aiming that by 2010 about 10% of energy and by 2020 17% of energy increases from renewable sources. These projections do not include energy from offshore wind, and are question to acquiring European and global goals to look after wildlife, and development by reviewing the RSS.
|
|
| Policy WAT4 | Flood Risk Management |
| Calls for sustainable drainage systems to be included in all relevant developments. | |
| Policy WM2 | Waste Management Targets |
| The goals are to do away with the land filling of crude local waste by 2021 and safeguard:
• municipal waste – recovery by half at 2010 and 70% at 2015; • Commercial and industrial waste – recovery of 72% at 2010 and 75% at 2015. |
|
- Core Strategy and Development Control Policies Development Plan (2008)
(Relative extracts)
| Sustainable locations |
| Connecting land needs and directing development to areas with limited risk and are upheld by lifetime and cost effective services whilst limiting harm to the environment. |
| Access and accessibility |
| 1. Expeditions between towns
2. Trips between home and work, high street shops, sport, recreation and culture 3. Rides between services, academic institutions and health facilities 4. Ease of travelling from home to street, and within buildings |
| Delivering New Housing |
| The Borough Council has noted land that aligns with the regional requirement to offer 700 new homes yearly in 2001-2021. |
| Policy CP7: Area Action Plans |
| The development of new housing are to be designed to acquire a high quality growth. This calls for incorporation ways to access, open space, historic features, landscaping and habitat creation, among others in the new neighbourhood and communities. |
| Policy CP15: Meeting the Housing Need for Our Communities |
| The Borough Council will integrate the dwelling types, sizes and accommodation, to balance the varied household and lifestyle to create a mix. |
| Policy CP20: Achieving Well-designed High Quality Places |
| The Borough Council needs a plan the new development to for high quality successful places, that people live and work, which are safe. These new development are based on site appraisal and keen to the context. |
| Policy CP22: Securing Economic Growth |
| The Borough Council looks to sustain good levels of economic and employment development. Backing is directed to proposals that acquire job growth and premium retailing. This is met through:
· guiding key investments like leisure to Chelmsford Town Centre; |
| Policy DC3: Managing Development Density in Different Locations |
| Within the Chelmsford Town Centre Area Action Plan area, <…> the Borough Council aims to acquire a capacity of about 50 dwellings per hectare, until Borough Council has acquired its policies in the Development Plan Document showing a lesser density is relevant. |
| Policy DC7: Vehicle Parking Standards at Developments |
| In the areas covered by the Chelmsford Town Centre Area Action Plan, maximum car parking not more than 70% of the set standards (Chelmsford weekly News).
Calculation of Parking Requirements These standards are connected to the floor space area. Thus, the floor space is rounded down to the nearest whole number to give a total requirement of 4 spaces. |
| Policy DC8: Health Impact Assessments |
| Development proposals will have to evaluate their influence health services and facilities. For residential development above 50 units and non-residential development above 1,000 sq. m. This acquires the Health Impact Assessment that assesses a broader influence on healthy living and calls for needs imparted on health services and tools from the development. |
| Policy DC14: Protected trees and hedges |
| Planning permission is turned down for development that leads to harm of woodland, trees and hedgerows, unless circumstances that call for the developer to protect themselves. This would call for a replacement in another area. |
| Policy DC18: Listed buildings |
| Planning permission will be rejected where development proposals affect the listed structures buildings, does not preserve or develop the special character and setting of the structures. The Borough Council allows the change of application of listed building bent on long-term preservation.
Full information on any changes calls for application of the proposed use, are issued with changes in applications. |
| Policy DC31: The Provision of Affordable Housing |
| The Borough Council calls for the issuance of 35% residential units to be issued and maintained as accessible housing in the
all new residential development of sites that: have a size of about 15 or more dwellings; or an area of 0.5 ha or bigger; or found in a small rural Defined area and have a size of 5 or more dwellings |
| Policy DC40: Public Open Space for New Residential developments |
| For the new residential project in the Borough a limit of 52 square metres per dwelling of local open space and 30 of strategic open space is issued, except if a commuted sum is allowed. |
| Policy DC43: Promoting Public Art in New Development |
| The Borough Council aims to acquire public art in connection to projects of 10 or more dwellings or for over 1,000 sq. m. floor space or those with major influence on public setting or a bigger level of public access, for installation in the development area or on public or street space in the development area. |
|
Maximum vehicle parking standards
|
- Parking Standards: Essex (2009)
Marketing strategy
The projects calls for the services of Estate Agents skilled in real estates to set up campaign.
- Letting would be charged 10% for the first year and 15% for several agents.
- Sale: 3-4% for huge projects
- Disposal: the cost would be based making clients conscious and convincing them for the best price.
- Additional cost to the agent: preparation of resources like posters, media promotion and planning among others.
For an integrated use of development based on commuters, added costs like guides are issued to them in addition to media promotion for national level (Commuter Guide).
To advance the project in cost and time, the agent acquires the help of local companies. They add value in planning, design and assessment for enhanced market value and competitive prices.
Design briefing
Focus on client’s proposals and acquire the existing details. Come up with a brief of the project with the help of the client. It has to be clear and comprises of means and most effective requirement, model, loading and storage among others. Investigations are undertaken.
The design brief is evidence that the client has agreed a design model that the project is based.
Proposals for handover disposal and use
The architect creates manuals and maintenance plans that help the one occupying. Additionally, there is a description of the facilities that need replacing and recommendation of how to maintain the building.
The handover process has to be explicit and agreed in a report with a checklist for the people involved. Once everything is completed, payments are made or halted until all work is done met the needed level. This is followed by signing of documents.
Environmental Impact Assessment
The Local Planning Authority is met regarding Environmental Risk analysis before planning is issued. The continuing plan of limiting risk on the environment is prepared. This can be done through
- Environmental analysis
This is done to note the extent of contamination in water and soil and acquire affordable answers.
- Maintain site clean
Safeguard pollution.
- Choose environmentally friendly materials
The suppliers and constructors have to be contacted on ecological sensitive materials. Like the use of recycled materials.
- Energy & Water Conservation
Conservation of energy and water from natural setting.
- Public Consultation
Allow the public to make good use of products through recycling and limited waste disposal.
- Compliance with environmental policies vital to Construction industry
Great enhancement could be directed to varied sources.
Appendix E: Chelmsford Town Centre Area Action Plan.
Section 3: Vision and objectives
Regional housing demand
The Borough demography is expected to grow by 5% from 2006 to 2021. This growth has to be put into consideration in the town center.
Unfulfilled shopping
There is a chance for retail development. The town is well populated, it has to acquire the need for a good market share.
Limitations in leisure and culture
The city has to offer recreation and culture. The city is limited in recreation and art and Chelmsford is well positioned to offer this.
Section 5: Mixed use strategy
Framework strategy
A successful town center has varied commercial activities and this is based on the economic flexibility and access by the population.
Chelmsford can acquire this through noting trends in land use and varied land use for development.
Town Centre Use
Based on the government policy, the uses include, leisure, retail needs and other commercial aspects. They are necessary and should not be overruled by residential settlements.
Section 6:
Comparison shopping
There is need for client choice and quality contrast while shopping. The Chelmsford retail approximates about a growth of 40, 000 sq. mets in 2016 in net sales. It is projected to rise till 2021.
Land for convenience (food) shopping
Research on Chelmsford shows an increase in size of 4300 sq. meters in net sales of convenience products, with a rise in 2021 of 3000 sq. meters.
Section 7: Business and economy
Profile
A good size number of Borough’s office space is based in Chelmsford leading to a rise in development and leasing in West End among other place. New developments include Coval Wells, Royal and Sun Alliance among others. The center houses a number of offices though most of the structures are not modern.
Section 9: Housing and Community
Housing size
In 2005 the size was 1,600 in the town center. However, with additional sites and capacity of 2000 can be projected.
Section 10:
Car Parking
This arises from the shoppers, commuters and visitors.
| A new multi storey car park located in Viaduct Road/Parkway would be necessary to serve the community. | This offers the much needed town centre parking spaces in Fairfield Road, Railway Street, Glebe Road |
Section 12: Buildings and townscape
The structures have varied heights. There are principles used:
- The heights are low in the historical areas in line with the market town design.
- Bigger development regions allow for higher heights and weight, for instance High Street and West End.
- The height is well defined in line with the design model of the area.
CTCAAP: Building heights for this location to acquire the highest density and proficient use of land.
REFERENCES & BIBLIOGRAPHY:
Books:
1. AASHTO 2010. Technical Manual for Design and Construction of Road Tunnels–civil Elements. Washington: DCRT.
- Burtonshaw-Gunn, S., A., 2009. Risk and Financial Management in Construction. England: Gower. (p.25, p.97)
- Rougvie, A., 1993. Project Evaluation and Development. London: B. T. Batsford Ltd. (p.74, p.115, p.212)
- Cadman, D., Topping, R., 4th, 1995. Property development. London: E & FN Spon. (p.184, p.225, p.227, p.264, p.275)
5. Lay, M. 2009. Handbook of Road Technology, Fourth Edition. New York: CRC Press, pp. 47-56.
- Mackmin, D., 2nd, 1994. The Valuation and Sale of Residential Property. London: Routledge. (p.108)
7. Ruban, M. Quality Control in Road Construction. New York: CRC Press, pp. 30-32.
- Sayce, S., Smith, J., Cooper, R., Venmore-Rowland, P., 2006. Real Estate Appraisal: from Value to Worth. Oxford: Blackwell Publishing. (p.161, p.163)
- Millington, A.F., 5th, 2000. An introduction to Property Valuation. London: Estates Gazette. (p.63-70)
- Scarrett, D., 1991. Property Valuation: the 5 methods. London: Chapman & Hall.
- Scarrett, D., 2nd, 2008. Property Valuation: the 5 methods. London: Routledge.
- Myers, D., 1994. Economics & Property: A coursebook for students of the Built Environment. West Midlands: Cradley Print Ltd
Documents:
- Red-bag. Site Survey Checklist (Construction Department). Acquired on 21st December 2013 from
http://www.red-bag.com/imageslib/RB26124.pdf
- gov. Planning applications history: Victoria Road South. Acquired on 21st December 2013 from:
http://www.chelmsford.gov.uk/planningonline
- gov. Chelmsford – a visitor’s guide. Acquired on 21st December 2013 from:
http://www.chelmsford.gov.uk/sites/chelmsford.gov.uk/files/files/documents/files/FINAL_PROOF_Chelmsford_Guide3.pdf
- Key Statistics – 1.5 Travel Patterns: Chelmsford Borough Council. Acquired on 21st December 2013 from
http://www.chelmsford.gov.uk/sites/chelmsford.gov.uk/files/files/documents/files/EB28.7%20-%20Key%20Statistics%20-%20Section%201.5.pdf
- Chelmsford affordable housing plan, 2011. Acquired on 21st December 2013 from:
http://www.nmcog.org/Chelmsford%20Affordable%20Housing%20Plan%20-%202011-12-29.pdf
- Lime house. Heart of Essex Housing Growth Scenarios (2012). Acquired on 21st December 2013 from: https://www.google.co.uk/url?sa=t&rct=j&q=&esrc=s&source=web&cd=5&cad=rja&ved=0CEsQFjAE&url=http%3A%2F%2Fmaldon.limehouse.co.uk%2Ffile%2F2238895&ei=tL7rULSCI4_K0AXks4GAAg&usg=AFQjCNEpA3Ziq3pchxm0Y1pnsl83yDpKWQ&sig2=gTrBIJFwhkYgykXWujyQPg&bvm=bv.1357316858,d.d2k
- Place profiles: A Summary Profile of Chelmsford (Local Futures). Acquired on 21st December 2013 from:
http://microsites.essexcc.gov.uk/publications/docs/FINAL%20Chelmsford.pdf
- Broads-Authority. East of England Plan. Acquired on 21st December 2013 from:
http://www.broads-authority.gov.uk/broads/live/planning/future-planning-and-policies/RSS_East_of_England_Plan.pdf
- Property Checklist Guide (Downloads). Acquired on 21st December 2013 from:
http://www.chelmsford.gov.uk/renting-out-your-property
- gov. A technical report for the Chelmsford Borough Local Development Framework 2001 – 2021 (Housing for the elderly: a demographic study of Chelmsford). Acquired on 21st December 2013 from:
http://www.chelmsford.gov.uk/sites/chelmsford.gov.uk/files/files/documents/files/EB37%20-%20Housing%20for%20the%20Elderly%20-%20%20A%20Demographic%20Study%20of%20Chelmsford.pdf
- gov. Renewable energy in 2011. Acquired on 21st December 2013 from:
http://www.decc.gov.uk/assets/decc/11/stats/publications/energy-trends/articles/5629-renewable-energy-2011-et-article.pdf
Online resources:
- Construction enquirer, 2011. Acquired on 21st December 2013 from http://www.constructionenquirer.com/2011/11/14/bids-invited-for-43m-essex-housing-project/
- Chelmsford weekly News. Acquired on 21st December 2013 from http://www.chelmsfordweeklynews.co.uk/news/8927878.Plans_revealed_for_former_ARU_campus_in_central_Chelmsford/
- Construction Index. Acquired on 21st December 2013 from http://www.theconstructionindex.co.uk/news/view/contractors-sought-for-40m-chelmsford-development
- Commuter Guide. Acquired on 21st December 2013 from http://www.commuterguide.co.uk/counties/essex/chelmsford#.UOuznW9YDfg
- Acquired on 21st December 2013 from http://statsuk.com/Towns/Chelmsford.html
- IRIS Environmental. Acquired on 21st December 2013 from http://www.irisenvironmental.ca/english/sectors/GolfCourse_ResidentialPamphlet_R.pdf
- Community Planning. Acquired on 21st December 2013 from http://www.communityplanning.net/pub-film/pdf/GuideToDevelopingACREProject.pdf
