zayed port material handling

Before i put the instructions there are few things I need:1. I already wrote the introduction, 2. use text citation for each paragraph, 3. I got 6 in my IELTS, so make it look like its mine.
also these are few points I need you to concentrate on:
MATERIAL HANDLING PRINCIPLES PORT FOLLOWS Eliminate handling Keep moving Use simple patterns of material flow Carry pay loads both ways Carry full loads Use gravity
4. TYPES OF MATERIAL HANDLING EQUIPMENTS IN PORT• Storage and handling equipment• Engineered system• Industrial trucks• Bulk Material handling
5. Considerations in Material Handling System Design SHIPHANDLING FORCES• PROPELLER• RUDDER• BOW THRUSTER• ANCHORS• LINES• TUGS Category Measures Physical state Solid, liquid, or gas Size Volume; length, width, height Weight Weight per piece, weight per unit Shape volume Condition Long and flat, round, square, etc. Safety risk and risk of Hot, cold, wet, etc. damage Explosive, flammable, toxic; fragile, etc.
6. Major Material Handling equipment at Port• Container Handling Crane• Stackers-Reclaimer• Ship Loader• Ship un-loader• Forklift• Specially designed Truck• Passenger Gangway
7. CONTAINER HANDLING CRANE The container handling crane is thespecially designed crane to load andunload the container from the ship andalso to the ship
8. Stackers-Reclaimer• A stacker is a large machine used in bulk material handling applications• A stacker usually operates on a rail- like structure with movable wheels, but the main operation is performed on a fixed place.
9. Ship Loader• A Ship loader is a huge machine used for loading bulk solid materials like iron ore coal, fertilizers, grains into marine vessels for transportation by sea.• Ship loaders are a very common sight in ports and jetties from where bulk materials are exported.
10. Ship un-loader• The grab-type ship un-loader is the traditional method to unload bulk cargo.• A clamshell bucket is cycled in and out of the ships hold, unloading with each scoop 15 – 20 cubic yards, depending on the design specifications.
11. Rail loading facility in port• For Coal handling and iron ore handling the rail load facility should be available in the port. The material handling i.e. loading and unloading is very complex and time taking.
12. RCC silos• Storage capacity of 10 tons to 50 tons.• Potential indoor and outdoor erection.• Pressure conveying system for feeding silo from big/25kg resin bag.• Vacuum conveying system provides multiple processing feeding lines from silo.
13. Forklift• A forklift (also called a lift truck, a fork truck, or a tow-motor) is a powered industrial truck used to lift and transport materials.
14. Passenger Gangway• Foot passengers need to be provided with a safe path to the accommodation deck when a ship is also being loaded or unloaded with heavy cargo. The passenger gangway will follow the movement of the vessel.
15. WAGON TRIPPLER• The rotary tippler designed for unloading broad-guage open railway by inverting the wagon by inverting on its own centre of gravity through an angle of 1700,thereby discharging its contents into hopper below rail.
16. MAJOR PLAYER OF PORT MATERIAL EQUIPMENTS• Elecon Engineering Company Ltd,• Escorts Group,• Doosan Heavy Industry and Construction,• Tecpro System Ltd,• Godrej Material Handling Equipment,• Asian Group Of Company,

Thanks!

Report Guide-Lines
Materials Handling Technology LOG 2203
Section: CGM & CGI
Spring Semester 2015

. Students are required to submit a report regarding specific topic / Issue / Obstacle / Case study/ or Materials handling technology applied in the UAE or any other Gulf Countries.
As presented in the course syllabus, this report is worth 20% of your final grade for the course.
The Report should be in the range (20 -25 pages), Hard copy & Soft Copy to be submitted to the instructor.
. Make sure that the title and ALL sub contents of the project are approved by the instructor prior your initial work on the project.

. Font size 12 is required to use beyond the cover page and the table of content page. Spacing between lines
should not be more than 1.5 is required, except for headings or titles. Locate references in the text as needed,
and use the brackets to indicate these references.
Labe all the figures, and graphs, don’t present any figures without elaborating on it in your report.
A Safe Assign software will be used to check your report, No direct copying is allowed, (Copy and paste from any source). You must use own English. If you are directly copying from any source, and exceeding 25% which will be identified by the Safe Assign software, your report will be rejected with zero grade .

Guide-lines for the report content
A cover page, with all important details (Institution, Course #, Course Title, section, date of submission, …etc.)
1- Table of content page
2- Abstract
3- Introduction to the topic
4- Reasoning behind choosing your project.
5- Literature review , or any suitable material
6- Description of the project, specifications, details…etc. (This section might include many sub titles)
7- Available data and information including figure and pictures from site if available
8- Design categories

10- Benefits of the implementation of the chosen project
11-Any further information that could enhance your report
12- Results and conclusion
13-References
14- Appendix
Example on references inside the body of the report:
Force is usually equal to the mass of the object multiplied by acceleration acting on it (1).
This formula might be changed in the general form depending on the application, but the content and the principle applies to all cases, as a result, since you changed in the statement, but still not your idea, you need to provide a reference at the end of the paragraph as shown: —————————————– (1)
And in the references page number 1 reference Must be the one mentioned above.
If you are directly quoting from a source you should use the brackets” such as : “ ————————— ” (2)
In the reference page be consistent by using only one form reference style for your materials.

Latest Assignments